Management Facility Infrastructure Maintenance

DMIT.io is hosted on an independent cloud infrastructure, which is currently undergoing scheduled maintenance.
Estimated maintenance duration: 1 hour.
来自频道: @DMIT_INC
LAX.EB

AS9929:
We've already report fault case with China Unicom about AS9929 issue.
DMIT has enough bandwidth with China Unicom. The bandwidth expansion has been completed but DMIT will not disclosure peering capacity any more in the future. DMIT still maintains a 50% bandwidth reserve. The current packet loss and fluctuations in latency are tentatively attributed to issues with China Unicom's backbone network.

AS58807:
CMIN2 is heavily oversold (On China Mobile US-CN backbone end). It has reach the ceiling of their capacity. However, they still sell small amounts of bandwidth to small customers. DMIT still maintains a 20% bandwidth reserve.
来自频道: @DMIT_INC
Some VM restarted outside of the scheduled maintenance window.
This was caused by a Kernel Panic.
Following the configuration corrections and kernel component updates, a final restart will still be required during the scheduled maintenance window.
We sincerely apologize for any inconvenience this may cause.
来自频道: @DMIT_INC
Scheduled Maintenance Facility: Los Angeles Data Center Scope: All Virtual Machines Maximum Simultaneous Impact: One Hypervisor at a time Maximum Impact Duration: 1 hour per client VM Time: 3:00 PM – 5:00 PM UTC (Correct, Eastern Standard Time) Dates: April…
来自频道: @DMIT_INC
/var/log/DMIT-NOC.log pinned «Scheduled Maintenance Facility: Los Angeles Data Center Scope: All Virtual Machines Maximum Simultaneous Impact: One Hypervisor at a time Maximum Impact Duration: 1 hour per client VM Time: 3:00 PM – 5:00 PM UTC (Correct, Eastern Standard Time) Dates: April…»
来自频道: @DMIT_INC
Scheduled Maintenance
Facility: Los Angeles Data Center
Scope: All Virtual Machines
Maximum Simultaneous Impact: One Hypervisor at a time
Maximum Impact Duration: 1 hour per client VM
Time: 3:00 PM – 5:00 PM UTC (Correct, Eastern Standard Time)
Dates: April 8 – April 16
Details: Resolving anomalies caused by suboptimal kernel configurations; a system reboot is required.
Note: Only one Hypervisor will be processed at a time; therefore, the overall maintenance period will be extended.
来自频道: @DMIT_INC